Construction and operation of road network connecting Egnatia Odos, with settlements of Pilea - Chortiatis Municipality (EIA 334):
This is the EIA Study for the construction and operation of a new road network of 17,4km.

The width of the carriageway is 25m, while the structures along the alignment, include: one bridge of 290m in length, 4 twin tunnels with a total length of 2.370m and 1 Cut & Cover of 780m length. It is also planned the construction of 4 interchanges on the artery and the remodeling of an existing one.
Assignment Authority: Egnatia Odos SA
