INSTALLATION AND OPERATION OF MOBILE CONCRETE BATCH PLANTS (MAO 5000/3350 & MB 7000) for the construction of Unit V of Ptolemais steam power station (SEPS)(T.S. 156)
The project - activity entitled "Installation and operation of the 660 MWe electric power plant of" PPC SA ", with pulverized lignite fuel with a capacity of 140 MWth for district heating, in the space Of the depleted mine of Komanos of the lignite field of Ptolemaida, of the municipality of Eordea of Kozani "has been licensed to the environment with the number 211598 / 3-5-2012 SEPS as it has been amended by the number 29105 / 30- 6-2016 Decision.
The new SEPS has been placed in place of the depleted lignite area of the Komana mine in the Ptolemaida area of Municipality of Kozani. It will consist of a steam power plant with a gross nominal power of 660 MWe with a capacity of 140 MWth for district heating. Unit V (the main installations of the SEPS excluding the lignite yard) will be built on a land of 576 acres, which is developed on a property plot PPC total area of 8.343 acres. The unit is located about 7km southeast of Ptolemaida and about 20km north of the city of Kozani. The nearest settlement is Karyochori, about 700m north of the Unit Stadium.
The stadium of Ptolemaida V SEPS belongs to the Municipality of Ag. Friday of the Municipality of Eordea of the Regional Unity of Kozani of the Region of Western Macedonia.
As an accompanying task necessary to meet the construction needs of the main project is the installation and operation of two (2) concrete production units (MAO 5000/3350 & MB 7000) in the southern part of the project site.
The study aimed at environmental licensing of these units.
Assignment Authority: Private person