Modification of the existing environmental terms of the project “Installation of a 416,95 MWe power plant , under ISO conditions, with fuel natural gas, at Aliveri thermal plant and operation of Aliveri thermal of the Public Power Corporation SA” (EIAS 280)

This study aims to amend the existing environmental terms (160235/17-10-2008 Joint Ministerial Decision) of the above mentioned project in order to take into account stream realignment works not included in the original design of the project. A stream that flows within the plot of the Public Power Corporation will be realigned over a total length of 517m to ensure the flood protection of the investment.

Assignment Authority: PPC S.A