STUDY FOR RESTORATION OF THE LIPTOL AREA (NRMS 16)

STUDY FOR RESTORATION OF THE LIPTOL AREA (NRMS 15)

This involves the development of a Restoration Study of the area occupied by the facilities:

of the inactive  SES of the LIPTOL area

of the inactive coalbrick factory and Lignite Post-processing plant ,

of the inactive unit of Carbonization

and the related transport systems of lignite and by-products

The study includes the following sections:

Existing situation – description of establishments

General description of the equipment – materials –waste

Description of possible deactivation of mechanical/ electrical equipment

Description of possible deactivation of building infrastructure

Description of management of electromechanical equipment – materials -waste – alternative solutions

Description of demolition process of building establishments - alternative solutions

Process of demolition - Management of demolition materials – timetable

Assignment Authority: PPC SA